Overview
Weather forecasts inform estimates of when vessels can access offshore turbines. Uncertainty in the duration of one maintenance task can affect the timing of subsequent stops. The model assigns tasks to vessels and jointly determines their routes and maintenance schedules to restore generating capacity sooner. A two-echelon matheuristic combines adaptive search with fix-and-optimize steps.
Findings
On test instances derived from the Empire Wind development, the method produced solutions close to the certified optima where those optima were available. Rolling-horizon experiments examined how maintenance plans change as new information about offshore conditions becomes available.
Author contribution
First author. I contributed to conceptualization, methodology, and investigation, and drafted the manuscript.
